Home / Services / Slabs

House & Shed Slabs

Concrete slabs for homes, extensions, sheds, garages, carports and farm buildings, poured to engineer’s specifications.

Plain concrete by GCM Concrete

Slabs built right from the ground up

A slab is the foundation of everything built on it, so it has to be level, square and to spec. GCM Concrete pours house slabs, extension slabs, shed and garage slabs, carport bases and farm slabs across West Gippsland and South East Melbourne.

We handle site levelling and excavation with our own machinery, set out formwork, place steel and plumbing penetrations to plan, and pour with the right concrete strength for the job. For shed slabs we work to the shed supplier’s footing and slab drawings so your kit goes up without dramas.

Concrete driveway by GCM Concrete

Slabs we pour

House & extension slabs

Waffle pod and raft slabs to engineer's drawings.

Shed slabs

Garden sheds through to large farm and machinery sheds.

Garage & carport slabs

Level, strong bases with falls for drainage.

Site levelling

Cut and fill, excavation and compaction with our own machines.

How it works

From quote to finished driveway

01

Free on-site quote

We measure up, check levels, drainage and access, show you colour and finish samples, and give you a fixed written quote.

02

Excavation & prep

Our own machinery digs out, removes old concrete if needed, compacts a crushed rock base, and sets formwork and steel mesh.

03

Pour & finish

We pour high-strength concrete and finish it to your choice: plain broom, coloured, exposed aggregate, stamped or faux brick.

04

Cut, seal & handover

Control joints are cut to limit cracking, the surface is sealed where needed, and we walk you through curing and care.

Our work

Slab & concreting projects

FAQs

Frequently asked questions

Most domestic shed slabs are 100 mm thick with mesh. Sheds for heavy machinery, trucks or hoists usually need 125–150 mm with thickened edges or footings. Always follow your shed engineer’s drawings.

Many sheds need a building permit depending on size and zoning. Your shed supplier or building surveyor will advise. We pour to the approved plans.

Yes. We have our own excavation gear, so we can level the site, dig footings and prepare the base before the pour.

Light construction can usually begin after a few days. The slab reaches design strength at around 28 days.

Ready for a new driveway?

Free on-site quotes across South East Melbourne and West Gippsland. Open 7 days.